Phase 1& 2 – The vertical concrete tiles were removed and then disposed of, we then removed the original flat roof material, replacing it with a high-performance 3 layer felt system.Next the vertical hanging keymer tiles were installed with the attractive lead apron flashings. The next stage was to complete the vertical tile hanging in Keymer hand made plain tiles with feature lead work apron flashings.