The felt roof was stripped back, the rubbish taken and tiles of the abutment and parapet removed. A high-grade grey mineral felt was applied to the existing boarding. The pre-existing tiles and ridge tiles were re-bedded along with matching additional tiles needed sourced from reclaim where needed.